Subcontractor Login

« Recreational

Donelson-Hermitage Family
YMCA Renovation

Hardaway Construction - Donelson-Hermitage Family<br>YMCA Renovation
Location: Nashville, TN
Owner: YMCA of Middle Tennessee
Architect: Collective Design Solutions, LLC

A 20,000 SF renovation along with a 6,200 SF Addition to the existing Donelson-Hermitage YMCA.  Renovations were made to the existing portions of the building that received additions as well as the Welcome/Entry area, Social Area, Corridors, and Spin Room. The existing offices were relocated to the renovated areas once they were complete. The addition included  Wellness, Group Exercise and Kid’s Play areas.  The project also included the addition of a fire sprinkler system to the entire building.

Exterior work included a new entry along with handicap ramps for better accessibility. The front façade was modified and upgraded with windows and metal panels. The existing parking area was capped with new paving and the layout modified for improved traffic flow. The access drive at rear was also widened for more suitable emergency & maintenance vehicle access as well as addressing drainage issues. A segmented retaining wall was added where the drive was widened.

« Back to Recreational

Follow us on:
Hardaway Construction on Twitter Hardaway Construction on LinkedIn